UAE complete railway network and freight is already moving

Source: RailFreight
Date: 27th February 2023

The United Arab Emirates (UAE) can finally count on a nationwide railway network. The Vice President and Prime Minister of the UAE, led the inaugural ceremony on Thursday, 23 February, in Abu Dhabi. State-owned Etihad Rail mentioned that all seven emirates will now be connected to a main national railway, with rail freight operations already launched across the country.

The new railway network stretches for roughly 900 kilometres across the country. Concerning rail freight, the network can count on 38 EMD SD70 locomotives and over 1,000 wagons. Etihad Rail pointed out that these locomotives will be the most powerful freight train engines in the Middle East, with a power of 4,500 HP. The locomotives will be supplied by Progress Rail, an American manufacturer, while the wagons will be supplied by Chinese company China CNR.

The network will be used for the transportation of all sorts of goods, as the chairman of Etihad Rail highlighted. The cargo types mentioned by Etihad Rail include petrochemicals, raw steel, limestone, cement, building materials, industrial and domestic waste, aluminum, food commodities, and general cargo. Mining company Stevin Rock and chemical manufacturer Borogue are among the first EAU companies to sign contracts to use the brand-new network.

A massive project to incentivise rail over road
The total estimated capacity for the network is 60 million tons of cargo moved every year. The EAU expects this new network to reduce road traffic by 21 percent by 2050. Freight trains on the new National Rail Network will reach speeds of 120 km/h. The network was built with a European standard gauge and will be equipped with ECTS level 2 signaling systems. The network will be connected to four major ports, which were not specified, and 7 logistics centres across the EAU.

The network is also equipped with a number of charging stations at the main hubs, including the Khalifa Port, the Dubai Industrial City, and the Jebel Ali Port. The massive scale of the project can be summed up with some of the data provided by Etihad Rail. “Eleven contractors, 25 consultants, and 28,000 specialists worked on the project. It took 133 million working hours to complete, and 40,000 approvals from 180 government agencies”.

NEOLink cooperated with our order processing system. He did not replace it or force solutions. Logfret did it better than other companies on the market – it adapted its system to ours. Logfret didn’t come to us saying, “We have this solution, and you either use it or we won’t cooperate.

Procurement Director

Pumps Manufacturer

We made a huge improvement in global visibility with a global platform—anyone can log into NEOLink and look at a shipment anytime, anywhere in the world. We wanted a freight forwarder with a good technology platform, which could handle the complexities of our business and we found NEOLink!

A global leader in performance materials and specialty chemicals

My suppliers have less or zero experience with international logistics. Thus, not able to create proper documentation which leads to tremendous delay. Thanks to Logfret who provide training to all suppliers and work with us to build up a consolidation hub to reduce transportation costs significantly.

One of the world’s leading designers, manufacturers and distributors of ride control products